{"role":"investigator","findings":[{"claim_id":"C1","status":"supported","basis":["ARC-002","ARC-003"],"reason":"ARC-002 defines T-9 completion as execution of all 12 planned runs with recorded results, not success of those results. ARC-003 states all 12 planned T-9 runs executed and have result records (lab 8/8 completed; field 4/4 completed, with one field failure).","caveat":"ARC-003 also records one failed field run; completion under ARC-002 is not equivalent to all runs passing."},{"claim_id":"C2","status":"supported","basis":["ARC-004"],"reason":"ARC-004 closes LAB-22 after the containment rerun and states no open safety blocker remains for the lab path as configured in T-9.","caveat":"ARC-004 explicitly does not cover field path F-4; the claim text is lab-path-scoped only."},{"claim_id":"C3","status":"contradicted","basis":["ARC-003","ARC-005","ARC-006","ARC-011"],"reason":"ARC-006 supersedes ARC-005's preliminary F-4 green: the final F-4 stress run reproduced relay loss, FIELD-31 is open, and ARC-006 blocks describing F-4 as stable or production-ready. ARC-003 records one failed field run. ARC-011 ties participant production assessment to FIELD-31 resolution and another passing F-4 stress run.","caveat":"ARC-005 is superseded and must not be treated as current F-4 status."},{"claim_id":"C4","status":"contradicted","basis":["ARC-007","ARC-008","ARC-009","ARC-010","ARC-011","ARC-012","ARC-018"],"reason":"ARC-007 names five T-9 participants: Meridian Institute, Bluefield Devices, Northstar Systems LLC, Kestrel Operations, and Delta Civic Lab; Northstar Labs Inc. is a separate non-participant. ARC-018 requires each named organization's explicit written production-readiness statement for the exact deployment scope; silence, participation, and third-party praise do not count. ARC-008 Meridian completed lab adapter work and is not confirming production readiness. ARC-009 Bluefield confirms lab-path interoperability only and approves no production-readiness statement. ARC-011 Kestrel will not assess production readiness until FIELD-31 is resolved and another F-4 stress run passes. ARC-012 Delta acknowledged the result packet but sent no readiness statement. ARC-010 is third-party praise from non-participant Northstar Labs Inc., not a participant confirmation.","caveat":"Selected sources contain no production-readiness statement from actual participant Northstar Systems LLC; that absence is an unknown for that org but does not repair the claim that all five confirmed readiness."}],"authority_findings":[{"status":"chair-unavailable-delegated-to-two-deputy-rule","basis":["ARC-001","ARC-014"],"reason":"ARC-001 requires public status note approval from chair Mira Solano or, if unavailable, both deputies Jonah Kim and Elena Ortega; technical expertise alone does not authorize publication. ARC-014 states Mira is unavailable 2026-08-10 through 2026-08-12 and may approve urgent public notes only via that existing two-deputy rule."},{"status":"dual-deputy-approval-not-met-for-PSN-17-as-drafted","basis":["ARC-001","ARC-015","ARC-016"],"reason":"ARC-015: Jonah retains C1 and lab-scoped C2, requests removal of C3 and C4, and will approve a corrected full note only after seeing replacement text—so he has not approved PSN-17 as drafted with C3/C4. ARC-016: Elena approved only the numeric T-9 results table and has not approved PSN-17, its prose, or any corrected replacement. Under ARC-001 both deputies are required while the chair is unavailable; that joint approval path for the drafted note is incomplete."},{"status":"risk-register-limits-publishable-content","basis":["ARC-020"],"reason":"ARC-020 classifies publishing C3 or C4 without correction as a material accuracy failure, and allows publishing C1 and lab-scoped C2 only after valid sign-off—which is not present for the full drafted note."}],"material_unknowns":["No selected-source production-readiness statement from participant Northstar Systems LLC (distinct from non-participant Northstar Labs Inc. in ARC-007/ARC-010).","Elena Ortega's approval or rejection of any corrected PSN-17 prose is unknown; ARC-016 covers only the numeric results table.","Jonah Kim's post-correction full-note approval is contingent on replacement text not present in the pack (ARC-015).","Whether both deputies will complete dual approval before planned publication 2026-08-11T09:00:00-07:00 while Mira remains unavailable through 2026-08-12 (ARC-014) is unknown."],"discarded_distractors":[{"id":"ARC-010","reason":"Alias/org confusion: Northstar Labs Inc. praise is not a T-9 participant confirmation and is not Northstar Systems LLC (ARC-007, ARC-018)."},{"id":"ARC-005","reason":"Superseded preliminary F-4 green; current field status is ARC-006."},{"id":"ARC-021","reason":"Unrelated June minutes formatting."},{"id":"ARC-024","reason":"Unrelated travel stipends."},{"id":"ARC-029","reason":"Unrelated developer-experience survey count."},{"id":"ARC-035","reason":"Unrelated workshop Wi-Fi."},{"id":"ARC-042","reason":"Unrelated volunteer onboarding."}]}